Engineered for power liftoff, heavy tie-ups, and unyielding mat traction. Continuous 1-piece virgin gum rubber wraps seamlessly around the sidewalls with an integrated internal anti-torsion shank. Fully compliant with UWW and NFHS competition guidelines. Factory-direct OEM from 300 pairs.
Engineered for heavy lifters, heavyweight wrestlers, and athletes requiring maximum midfoot stability.
The continuous rubber perimeter climbs 18mm around the medial and lateral margins of the shoe, preventing canvas tearing during extreme sideways pushing and defensive sprawling.
Integrated between the outsole and the Strobel lasting board, our molded thermoplastic polyurethane (TPU) shank eliminates midfoot twisting, protecting the plantar fascia during heavy kinetic drives.
The forefoot outsole extends over the front toe box to shield against abrasive mat friction, extending shoe service life to multiple collegiate seasons without stitch burst.
Transparent pricing structure based on standard microfiber suede + sandwich mesh configuration.
| Order Quantity (Pairs) | Unit Price (FOB Xiamen) | Production Lead Time | Customization Scope |
|---|---|---|---|
| 300 – 499 Pairs (Agile MOQ) | $16.50 – $18.50 | 35–45 Days | Laser logo on tongue, custom insole print, custom color trim |
| 500 – 1,999 Pairs | $14.80 – $16.00 | 30–40 Days | Full upper Pantone dyeing, custom rubber tint, branded gift box |
| 2,000+ Pairs (Container) | $13.20 – $14.50 | 25–35 Days | Full bespoke mold tooling with 100% tooling fee amortization refund |
Heavyweight wrestlers, Greco-Roman specialists, and power athletes benefit most from a unisole. The continuous full-length rubber contact provides extreme lateral rigidity and maximum leverage during tie-ups, upper-body throws, and defensive stands.
Our engineered unisole construction uses hollowed-out hexagonal core channels beneath the Strobel board, keeping total weight to 220g (US Men 9)—only 25g heavier than our split-sole model while delivering 40% higher torsional rigidity.
Standard MOQ is 300 pairs per colorway across US Men 7–15 (EU 38–47). Pre-production sample turnaround is 7 to 10 working days, and bulk container shipment takes 35 to 45 calendar days.
Yes. We offer turnkey 3D CAD tooling development. In-house CNC aluminum/steel mold cutting takes 15–20 days, and mold costs ($2,800–$3,500) are fully amortized and refunded once order volume reaches 3,000 pairs.
Direct response from Jinjiang engineering desk within 8 hours. PPS samples dispatched in 7–10 days.